Benson, Oxfordshire
- In-fill of swimming pool
This is a job that has taken place in Benson, Oxfordshire and was the
in-fill of an existing swimming pool. This job was completed within
a week and a half and entailed the following:
- Bottom of pool has to be broken up to allow peculation,
- in-fill with 500 tons hard-core manually via wheel barrow as inaccessible
by machine.
- Compact and consolidate.
- Top layer of scalpings.
- Covered with canvass (Tyran).
- 12 inches (40 tons) of top soil with which were raked and grass
seeded.
|