This is a job that has taken place in Buntingford, Hertfordshire and was the complete
removal of the existing system and new installation of a Klarchester BA BioDisc
with lift pump, which was connected to the inlet. This job was completed within
a week.
This included 50 metres of outlet from the biodisc to the discharge and everything
was put back to its original state. The soil was also raked and grass seeded by
Farley Groundworks.