FarleyGroundworks.com
Civil Engineering
Sewage and groundworks specialists
Skip Navigation LinksHome > Previous Jobs > Installation of 4 cesspools
Skip Navigation Links Binfield, Berkshire
Skip Navigation Links Binfield, Berkshire - Installation of 4 cesspools

This is a job that has taken place in Binfield, Berkshire and was the total installation of 4 cesspools.

  • This job took about 4 weeks to complete and entailed the installation of 4 cesspools surrounded in concrete.
  • Internal drainage gulleys for wash down area



You are Viewing: 01 (1 of 3)
< Previous | Next >